Huaneng automated mining trucks being loaded
Fully-automated electric trucks being loaded by excavators at Huaneng Group's Yimin open-pit mine in Inner Mongolia in H1 2025. Huawei, Huaneng, and other partners announced in May 2025 the successful operation of a fleet of 100 such trucks at the remote site. Check our press releases for details.
Terms of use
Photos may be used for editorial purposes only. All rights of use are with Huawei Technologies. All images used must be credited as “Huawei”.
Download(2.20MB)